YIWU & CHINA SOURCING
CHINA SOURCING / QUALITY CONTROL
Set the inspection criteria while the order is still being defined. A useful inspection report records what was checked, what was found and what needs your decision.
PROJECT DELIVERABLES
Set inspection criteria, review production readiness and record findings before shipment.
01
02
03
04
THE WORK BEHIND THE ORDER
Choose the tasks you need, the approval points and the records that will be handed over.
01 / SCOPE
Words such as premium or durable do not give an inspector a measurable requirement. Record dimensions, finish standards, function checks, packaging requirements and the approved sample. Classify the defects that matter most to your product and agree how findings will be handled.
02 / SCOPE
An early production check can identify an issue while there is still time to correct it. A pre-shipment inspection evaluates goods when production and packing meet the readiness conditions agreed for inspection. Piece-by-piece checking is a different service and should be scoped separately.
03 / SCOPE
A report should explain the inspection scope, product identification, sampling method, findings and limitations. Photos are helpful when they link to a specific observation. If testing is outside the inspector’s capability, the report should identify that gap rather than imply that a visual check proves compliance.
04 / SCOPE
An inspection finding does not resolve itself. Decide whether the supplier will rework, replace, sort or provide another remedy, and who approves the final release. Reinspection scope and related charges should be confirmed before the next visit.
AGREE THE NEXT STEP
BEFORE YOU START
No. Inspection checks the agreed product and order criteria. Compliance testing and certification may require an accredited laboratory or other qualified specialist for the destination market.
No. Inspection reduces uncertainty within its agreed scope. Sampling, access limitations and tests that are not included must be stated clearly.
CHOOSE THE RIGHT CHECKPOINT
Check availability, access, sampling scope, cost and the time needed for a decision. No checkpoint automatically includes every other checkpoint.
Swipe across to read all columns →
| Checkpoint | What to review | Decision it supports |
|---|---|---|
| Before production | Approved specification, materials, sample, artwork and inspection checklist. | Whether the order is ready to start with sufficiently clear requirements. |
| During production | Selected production stages, workmanship and progress against the agreed scope. | Whether a correction is needed before more units are completed. |
| Before shipment | Presented quantity, sampled product checks, packing and identification. | Whether to release, rework, recheck or hold the inspected lot. |
| During loading or handover | Cargo identity, carton counts, visible condition and relevant loading records. | Whether the goods presented for handover match the agreed shipment record. |
MAKE THE CHECKLIST SPECIFIC
01
List model, SKU, material, colour, dimensions and tolerances. Include the approved reference and any component differences that would make a substitution unacceptable. Measurements need a method so the supplier and reviewer do not compare different things.
02
Use defect photographs and agreed descriptions where possible. Define the closures, seams, decoration or assembly to check. If a functional test is included, state equipment, duration, conditions and acceptance criteria instead of using “works well” as the instruction.
03
Specify retail pack, set contents, barcode version, units per carton and carton marks. A product that passes a visual check can still arrive as an unusable assortment if size labels, artwork versions or component counts are wrong.
THE REPORT & THE RELEASE
An inspection report should identify the inspected lot, date, location, quantity presented, sample scope, checks performed and observations. Photographs should show relevant details and defects with enough context to understand the finding. Missing access, unperformed tests and incomplete production need to remain visible.
The agreed decision maker reviews the report against the acceptance criteria and open issues. If goods need rework, record the corrective action, affected quantity and recheck plan. A supplier’s promise to fix a defect is not evidence that the correction has been completed.
WHEN AN ISSUE IS FOUND
No. Sampling provides evidence about the inspected lot within an agreed scope; it does not examine every characteristic of every unit. The report should state its limits. A full-unit check, specialist test or additional checkpoint needs to be scoped separately when required.
Identify the authorised buyer or project decision maker in the scope. Findings should be reported clearly, including unresolved items. Shipment release and any acceptance of a deviation need a recorded decision; the existence of an inspection report is not itself approval.
A recheck can be discussed after the corrective action and affected quantity are defined. Confirm access, readiness, scope and additional charges. Keep the original finding, corrective response and follow-up result connected so the final release decision has a readable history.
LET’S MOVE YOUR IDEAS FORWARD
Send a product photo or link, quantity and destination. We’ll work through the sourcing, branding and shipment questions with you.